6686体育

| | English
网站地图前, 要设定延迟翻译时间, 如100表示100ms,默认为0 var cookieDomain = "http://hyu2902120001.my3w.com/"; //Cookie地址, 一定要设定, 通常为你的网址 var msgToTraditionalChinese = "繁體"; //默认切换为繁体时显示的中文字符 var msgToSimplifiedChinese = "简体"; //默认切换为简体时显示的中文字符 var translateButtonId = "translateLink"; //默认互换id translateInitilization();
SN:603929
L&K Engineering (Suzhou) Co., Ltd.

SMIC Southern IC Manufacturing Co., Ltd.

date:2019-09-06    browser:156
Name of the Engineering:  2018 sMIC Southern Fab8 P2 Power Phase I Project - CUS Procurement and Installation Engineering
locations of the Engineering: 18 Zhangjiang Road, China (Shanghai) Pilot Bonded area
Summary of the Engineering: 
1. Phase I of the Project Consists of 8 Ice Machines and 4 Cooling Towers
 




Foucs

Copyright © 2018 by lkeng. All rights reserved. 苏ICP备44191690号-1 Tel 86-512-67027000

网站地图