6686体育

| | English
网站地图前, 要设定延迟翻译时间, 如100表示100ms,默认为0 var cookieDomain = "http://hyu2902120001.my3w.com/"; //Cookie地址, 一定要设定, 通常为你的网址 var msgToTraditionalChinese = "繁體"; //默认切换为繁体时显示的中文字符 var msgToSimplifiedChinese = "简体"; //默认切换为简体时显示的中文字符 var translateButtonId = "translateLink"; //默认互换id translateInitilization();
SN:603929
L&K Engineering (Suzhou) Co., Ltd.

Hangzhou Lion Microelectronics Co., Ltd.

date:2018-01-26    browser:162
Project name: FAB-C1 Electromechanical Engineering of Hangzhou Lion Microelectronics Co., Ltd.
FAB-D Engineering of Hangzhou Lion Dong Core Microelectronics Co., Ltd./Arsenic-containing Wastewater Engineering of Hangzhou Lion Dong Core Microelectronics Co., Ltd.
Work place: No. 199, No. 20 Avenue, Xiasha Economic Development Zone, Hangzhou
Construction unit: Hangzhou Lion Microelectronics Co., Ltd.
Construction area: 15,840 m2
Introduction: Hangzhou Lion Microelectronics Co., Ltd. is located in Economic and Technological Development Zone of Hangzhou and power device are mainly regarded as the main production.It added production line for 6-inch circuit wafer of gallium arsenide microwave radio frequency (RF) in 2016.
Project introduction: The Company was responsible for clean room for MOS production line in 2015, with an area of about 3,000 m2.
The Company was responsible for clean room of production line for circuit wafer of gallium arsenide microwave radio frequency (RF) in 2016, with an area of about 3,000 m2.
 

Foucs

Copyright © 2018 by lkeng. All rights reserved. 苏ICP备44191690号-1 Tel 86-512-67027000

网站地图